Langsung ke konten
Kamis, 12 November 2026 07:11:11 KST Semua Berita Pengumuman Masuk Daftar Masuk 한국어 ENG 日本語 Deutsch Español
The Korean TodayDicari cabang luar negeri siapa cepat dia dapat (tab baru)

Bahasa Indonesia · Sosial ·

Incheon Subway Line 7 Cheongna Extension: Excavation Halted at Station 006 — City Says Work Will Resume After Safety Is Secured

Intisari dalam 3 Baris
  1. Incheon City halted excavation work at Station 006 in Section 6 of the Cheongna International City extension of Seoul Metro Line 7 from June 22, after measurements exceeded control standards.
  2. The city said surface subsidence and groundwater level measurements exceeded the standards set in the underground safety assessment report, and it is conducting a joint expert inspection and detailed cause investigation.
  3. The city plans to resume construction once safety measures are in place, and explained that work on the main line section is proceeding normally.

Ditulis oleh wartawan kami · Ringkasan 3 baris oleh Koto, asisten AI The Korean Today · 88 bahasa

Incheon Subway Line 7 Cheongna Extension: Excavation Halted at Station 006 — City Says Work Will Resume After Safety Is Secured

Baca artikel lengkap (terjemahan mesin) → Artikel asli (bahasa Korea): 인천 지하철 7호선 청라연장 006정거장 굴착 중지…시 “안전 확보 뒤 재개”

WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Intisari dalam 3 BarisSelengkapnya ›

Belajar bahasa Korea gratis — dalam bahasamuSaluran YouTube gratis untuk setiap bahasa. Bahasa baru ditambahkan setiap hari. YouTube · @wiakoreanid ↗Hotel di SeoulWIA Trip · 24wiatrip.com ↗