Skip to content
Monday, November 16, 2026 22:37:08 KST All News Notices Log in Sign up Log in 한국어 ENG 日本語 Deutsch Español
The Korean TodayGlobal branches wanted first come, first served (new tab)

English · Welfare Policy ·

Exit Road to Juan Industrial Complex Opens to Improve Traffic Flow on Incheon-daero

Key points in 3 lines
  1. The Incheon Metropolitan City Construction Headquarters announced on the 5th that it has opened the exit road to the Juan National Industrial Complex, part of the Incheon-daero generalization project.
  2. The exit road has a total length of 480m in the Incheon direction and a width of 3.25m, and connects to Yeomjeon-ro, improving access to the Juan Industrial Complex.
  3. The opening is a temporary measure, and the road will be converted into an intersection once the project is complete, so drivers should check changes to traffic signs and guide boards.

For everyone: Koto, The Korean Today's AI, sums it up in 3 lines · 88 languages

Exit Road to Juan Industrial Complex Opens to Improve Traffic Flow on Incheon-daero

Read the full article (machine translation) → Original article (Korean): 인천대로 일반화 사업 속도 낸 주안산단 진출로 개통… 교통 흐름 개선 기대

WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Key points in 3 linesMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗