Skip to content
Thursday, November 5, 2026 00:09:16 KST All News Log in Sign up 한국어 ENG Deutsch 日本語 中文
The Korean TodayOverseas branches wanted first come, first served (new tab)

English · 복지 정책 ·

Footbridge over Han River in Hanam breaks ground after eight-year wait, bringing Misa closer to Han River living area

Key points in 3 lines
  1. Hanam-si held a resident briefing session and groundbreaking ceremony on the 11th for a footbridge connecting Misagangbyeon Middle School and the Misa Hangang Park area.
  2. The bridge will be built at Seon-dong 419 with a length of 105m and a width of 5.6m, and LH will bear the full total project cost of about 13.3 billion won.
  3. Completion is targeted for 2027, and once finished, residents will be able to reach Hangang Park on foot or by bicycle.

Written by our reporter · 3-line summary by Koto, The Korean Today's AI assistant · 88 languages

Footbridge over Han River in Hanam breaks ground after eight-year wait, bringing Misa closer to Han River living area

Read the full article (machine translation) → Original article (Korean): ‘8년 숙원’ 하남 한강보행육교 첫 삽… ‘미사 한강 생활권 시대’ 눈앞

Key points in 3 linesMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗