Skip to content
Thu, 11/26 00:00:03 KST (UTC+9) Latest Log in Sign up Log in 한국어 ENG 日本語 Deutsch Français Español Português
The Korean TodayGlobal branches wanted first come, first served (new tab)

English · Economy ·

Power grid impact assessment to take effect on November 16 — standards for data centers in the capital area tightened

Key points in 3 lines
  1. The Ministry of Climate, Energy and Environment has enacted the 'Regulation on the Operation of the Power Grid Impact Assessment System,' which takes effect on November 16, to reduce the concentration of large-scale power demand in the capital area.
  2. A new 'power use density' item (5-point deduction) has been introduced, and for constantly high-load data centers locating in the capital area, the passing score rises from 70 to 75 points.
  3. The assessment result notice may not be assigned or transferred, is valid for one year, and may be extended once for up to one year.

For everyone: Koto, The Korean Today's AI, sums it up in 3 lines · 88 languages

Read the full article (machine translation) → Original article (Korean): 전력계통영향평가 16일 시행…수도권 데이터센터 기준 강화

Power grid impact assessment to take effect on November 16 — standards for data centers in the capital area tightened
WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Key points in 3 linesMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗