Langsung ke konten
Kam, 19/11 12:26:44 KST (UTC+9) Terbaru Masuk Daftar Masuk 한국어 ENG 日本語 Deutsch Español Français
The Korean TodayDicari cabang luar negeri siapa cepat dia dapat (tab baru)

Bahasa Indonesia · Sosial ·

Jung-gu Adds 825m of Heating Wires on Steep Side Roads at 8 Sites, Plus 8 New Snow-Removal Kits

Intisari dalam 3 Baris
  1. Seoul's Jung-gu is installing road heating wires along 825m across 8 steep slopes and side roads to prepare for winter ice, and will also set up 8 new snow-removal storage boxes.
  2. Five sites totaling 375m in Dasan-dong and Jangchung-dong have already been completed, and three sites totaling 450m in Hoehyeon-dong will be added by the end of this month, with a total project cost of 882 million won.
  3. Jung-gu has requested budget review to add heating wires along 11 locations totaling 1.33km next year as well.

Untuk semua: Koto, AI The Korean Today, merangkum dalam 3 baris · 88 bahasa

Jung-gu Adds 825m of Heating Wires on Steep Side Roads at 8 Sites, Plus 8 New Snow-Removal Kits

Baca artikel lengkap (terjemahan mesin) → Artikel asli (bahasa Korea): 중구, 급경사 이면도로 열선 8곳 825m 확충…제설함도 8곳 신설

WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Intisari dalam 3 BarisSelengkapnya ›

Belajar bahasa Korea gratis — dalam bahasamuSaluran YouTube gratis untuk setiap bahasa. Bahasa baru ditambahkan setiap hari. YouTube · @wiakoreanid ↗Hotel di SeoulWIA Trip · 24wiatrip.com ↗