Skip to content
Fri, 11/20 22:27:41 KST (UTC+9) Latest Log in Sign up Log in 한국어 ENG 日本語 Deutsch Português Français Español
The Korean TodayGlobal branches wanted first come, first served (new tab)

English · Economy ·

Speed within two months of zone designation: Mok-dong Complex 11 moves toward rebuilding with designation of project operator

Key points in 3 lines
  1. Yangcheon-gu announced that Korea Asset Trust has been designated and notified as the project operator for the redevelopment of Mok-dong Complex 11.
  2. The notification came two months after the zone was designated, about 10 months faster than Seoul's standard one-year processing period, and is the sixth complex in Mok-dong.
  3. Complex 11, currently 15 stories with 1,595 households, will be reshaped into up to 41 stories with a total of 2,679 households.

For everyone: Koto, The Korean Today's AI, sums it up in 3 lines · 88 languages

Speed within two months of zone designation: Mok-dong Complex 11 moves toward rebuilding with designation of project operator

Read the full article (machine translation) → Original article (Korean): 정비구역 지정 두 달 만에 속도전…목동 11단지, 사업시행자 지정 고시로 재건축 본궤도

WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Key points in 3 linesMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗