Skip to content
Tue, 11/24 07:51:48 KST (UTC+9) Latest Log in Sign up Log in 한국어 ENG 日本語 Deutsch Français Español Português
The Korean TodayGlobal branches wanted first come, first served (new tab)

English · Welfare Policy ·

Uranium Exceeds Limit at Seogeomdo Village Waterworks in Ganghwa; Treatment Facility Installed and Water Supply Restored

Key points in 3 lines
  1. Uranium above the standard was detected at the village waterworks facility in Seogeomdo, Ganghwa, so a water treatment facility was installed, and the water supply returned to normal from the 26th.
  2. After 0.045 mg/L of uranium was found in one of three wells, the Ganghwa Waterworks Office of the Incheon Metropolitan City Waterworks Headquarters halted its use and spent 80 million won.
  3. Re-testing after the facility began operating found no uranium, and the Waterworks Headquarters said it will conduct regular water quality tests every month.

For everyone: Koto, The Korean Today's AI, sums it up in 3 lines · 88 languages

Uranium Exceeds Limit at Seogeomdo Village Waterworks in Ganghwa; Treatment Facility Installed and Water Supply Restored

Official translation → Read the full article (machine translation) → Original article (Korean): 강화 서검도 마을수도 우라늄 초과…정수설비 설치로 급수 정상화

WIA Code — 이 기사 링크
인쇄용 · WIA Code 스캐너로 비추면 인터넷 없이 발행 확인
⇓ PNG 다운로드

This code contains the original Korean article.

이런 모양 WIA Code, 나도 무료로 만들기

Key points in 3 linesMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗